Skip to content
English
  • There are no suggestions because the search field is empty.

Separate Advance Billing/Pre Billing WIP A/C

Separate Production WIP postings into two separate GL control accounts for WIP (Debits) and Advance/Pre-Billing (Credits)

  • Click the  to open Accountability side-by-side with these instructions.
  • Click the  to open the full guide.

 

VIDEO TUTORIAL: