Separate Advance Billing/Pre Billing WIP A/C
Separate Production WIP postings into two separate GL control accounts for WIP (Debits) and Advance/Pre-Billing (Credits)
- Click the
to open Accountability side-by-side with these instructions. - Click the
to open the full guide.
VIDEO TUTORIAL: